Wastewater Treatment Plant Sewage Pump Project
Project Case
2026-09-13
wastewater treatment plant sewage pump project
Multiple non-clog submersible sewage pumps with auto-coupling installation for unattended operation at a municipal wastewater treatment plant.
The plant's original lifting pump station suffered from aging equipment and frequent blockages. After a site survey, our engineers selected multiple non-clog submersible sewage pumps and auto-coupling devices based on the sewage solids content, flow and head requirements.
Project Scope
| Industry | Municipal water |
| Equipment | Non-clog submersible sewage pump |
| Installation | Auto-coupling installation |
| Operation | Automatic level control, unattended |
Operating Results
- Large-passage anti-clog impeller handles long fibrous solids reliably
- Auto-coupling installation allows maintenance without personnel entering the wet well
- Level-linked start and stop reduces energy consumption